What shell and core means

Many new apartments and penthouses in Dubai are handed over as shell and core: concrete walls and slabs, service risers and a few connection points at the entrance. There are no partitions, no screed, no ceilings, no kitchen and no bathrooms. Before you can move in or rent the unit out, it needs a complete fit-out.

That makes a shell and core fit-out a different job from refurbishment. Nothing has to be demolished, but every system has to be designed and built from scratch, and the building management checks the drawings and the works more strictly than for a cosmetic renovation.

What the developer hands over and what we build

The first column is what you receive with the keys. Everything else is the fit-out.

From the developer

  • Concrete walls, slabs and columns
  • Water, drainage and power at the entrance
  • AC risers and chilled water points
  • Sprinkler and fire alarm points
  • Windows and the entrance door

We build: layout and MEP

  • Partitions and door openings
  • Electrics, distribution board and lighting circuits
  • Water supply and drainage to every room
  • AC ducting, fan coil units and ventilation
  • Suspended and shadow-gap ceilings

We build: finishing

  • Screed, waterproofing and flooring
  • Plaster, paint and wall finishes
  • Doors, skirting and joinery
  • Built-in wardrobes and storage
  • Lighting and switches

We build: kitchen and handover

  • Kitchen installation and appliances
  • Bathrooms with tiling and sanitaryware
  • Snagging and deep cleaning
  • Building final inspection
  • As-built documents and warranty

What to check before you accept the unit

Defects are easier to get fixed before you sign the handover. At the first site visit we go through this list with you.

  • Cracks in slabs, walls and around columns
  • Level of the floor slab and the ceiling height
  • Windows: frames, seals, glass and opening sashes
  • Balcony doors and drainage outlets on terraces
  • Positions of water, drainage and power points against the drawings
  • AC risers and chilled water connections
  • Sprinkler heads and fire alarm points are in place
  • Entrance door, lock and fire rating label
  • Meters, DEWA connection and the main isolator
  • Damage left by other contractors in the corridor

Documents for the building NOC

A shell and core unit cannot be fitted out without a no-objection certificate (NOC) from the developer or the building management. A typical application includes:

  1. Layout and MEP drawings of the fit-out
  2. Contractor’s trade licence and insurance
  3. Method statement and schedule of works
  4. Owner’s title deed or handover letter
  5. Refundable security deposit

If sprinklers or fire alarm devices have to be moved, the drawings may also need Civil Defence approval. We prepare and submit the full package, follow it up and plan noisy works around the building’s permitted hours. At the end we arrange the final inspection so the deposit is returned. You only sign the application as the owner.

More details in our guide: NOC for renovation in Dubai.

NOC preparation
Usually 1–3 weeks
Deposit
Refundable

How long a fit-out takes

The works on site depend mostly on the floor area and the number of bathrooms. The design and the NOC come before the works, but they can partly overlap: we start the NOC while the working drawings are being finished.

The table shows typical durations for our projects. You get a detailed schedule with the contract, and every week a photo and video report.

Typical durations
HomeWorks on siteFrom design to keys
1-bedroom, 800 sq ft3–4 months4–5 months
2-bedroom, 1,200 sq ft4–5 months5–6 months
3-bedroom, 2,000 sq ft5–6 months6–7 months
Penthouse, 4,000 sq ft7–8 months9–10 months

Design takes 4–6 weeks and the NOC 1–3 weeks. Custom joinery and imported materials can add time.

Fit-out prices

Prices are per square foot of floor area and cover labour and site supervision. Materials are chosen with you and priced separately in the specification.

  • Turnkey to your designYou bring the design; we build it and manage the approvals
    from AED 155 / sq ft
  • Turnkey with our interior designLayout, 3D visuals, working drawings and the build
    from AED 170 / sq ft
  • Turnkey with procurement and supervisionWe also source and order all materials and furniture
    from AED 195 / sq ft

How much a fit-out costs

A shell and core unit costs more per square foot than a cosmetic renovation because every system is built new, but it has no demolition and fewer surprises behind the walls. The biggest variables are the floor area, the number of bathrooms and how much joinery you want.

The figures on the right are starting budgets for works only. All materials, from screed and plasterboard to tiles, sanitaryware and lighting, are added in the specification, so you see exactly where the money goes.

Typical fit-out budgets for works, AED
HomeYour designOur designDesign and procurement
1-bedroom apartment, 800 sq ft124,000136,000156,000
2-bedroom apartment, 1,200 sq ft186,000204,000234,000
3-bedroom apartment, 2,000 sq ft310,000340,000390,000
Penthouse, 4,000 sq ft620,000680,000780,000

Rates: AED 155, 170 and 195 per sq ft. The final quote is fixed in the contract after a free site visit and design approval.

Estimate your own budget with the renovation cost calculator.

Example: from concrete to keys in 5 months

One of our recent apartments was handed over as a bare concrete shell. We levelled the walls and floor, built a ceiling with hidden lighting around the edge, fitted a handleless kitchen with built-in appliances and a stone-clad island, and laid engineered oak flooring throughout.

Floor area
1,290 sq ft
Duration
5 months
Works
AED 220,000

See the before and after photos

Fit-out questions

Can the fit-out start before I get the keys?

The works can only start after handover, because the NOC is issued to the owner. The design, however, can be done earlier, so the works start as soon as you receive the keys.

Who pays the NOC deposit?

The building management or developer sets the deposit. We can pay it on your behalf and include it in the payment plan; it is returned after the final inspection.

What if the developer handed over the unit with defects?

At the first site visit we check the unit against the list above. If we find defects, we list them for you so the developer fixes them under the handover warranty before the fit-out starts.

Is a fit-out cheaper than renovating a resale apartment?

Per square foot it is usually similar or slightly higher, because every system is built new. But there is no demolition and no hidden damage behind old finishes, so the budget is more predictable.

Do I need to be in Dubai during the works?

No. Many of our clients live abroad. You get a weekly photo and video report and can join a video call from site at any time.

Contact

Free site visit and first consultation anywhere in Dubai.

  • Phone

    +971 50 872 6770

    Mon–Sat 9:00–19:00

  • WhatsApp

    Message us

    Photos, plans and questions. We reply within one working day.

  • Email

    [email protected]

    For drawings, specifications and documents.

  • Where we work

    Across Dubai

    No office: we meet you on site or by video call.

Book a free site visit

Leave your name and phone number and we will call you back within one working day to arrange a free site visit.

Or email us at [email protected]

By sending the request you agree to the processing of your personal data under our privacy policy.